正域科技

加入我们

  • 姓名 *

  • 联系方式 *

  • 应聘岗位 *

  • 上传简历 *

    Upload

  • 提交

  • Security Code
    Refresh the code
    Cancel
    Confirm

公司动态

Important equipment for offshore wind power operation and maintenance - operation and maintenance ships

Click: Time:2022-06-09 00:00:00

Abroad, offshore wind power has been widely developed in Europe, and wind power operation and maintenance ports and ships constitute the main facilities and equipment for offshore wind power operation and maintenance. They are at the forefront of wind power operation and maintenance.

Against the dual background of China's "dual carbon" goals and the construction of a new power system, the wind power industry has entered a fast lane of rapid development, and offshore wind power operation and maintenance are in the initial stage.



At present, the main power of domestic wind farms is 5-6MW, and the 6MW wind turbines are shut down for one day. Calculated at 0.85 yuan/kW, the loss is 120000 yuan/day. Construction of wind turbines above 10MW will begin next year, with a maximum capacity of 15MW. The demand for operation and maintenance ships is gradually increasing, and small fishing boats will inevitably be eliminated in the future.

The existing types of operation and maintenance ships include ordinary operation and maintenance ships, professional operation and maintenance ships, and operation and maintenance mother ships.

 

A availability estimation model was established based on environmental conditions, the speed of the operation and maintenance ship, the adaptability of the operation and maintenance ship to the environment, the number of units, unit performance, and operation and maintenance capacity. The relevant data of a certain offshore wind farm was calculated using this model.

It can be seen from this that when the annual failure frequency of a single unit exceeds 5 times, the utilization rate of using a regular operation and maintenance ship is less than 95%; If a professional operation and maintenance ship is used, the utilization rate can exceed 96% when a single unit has 5 annual failures. When a single unit has 3 annual failures, the utilization rate can reach 98%.



The operation and maintenance mother ship is equipped with active wave compensation piers and other equipment, which can facilitate personnel or equipment transportation and wind farm maintenance operations under harsh sea conditions. Small wind power operation and maintenance ships can be equipped with multifunctional hydraulic high-altitude elevators to safely, quickly, and efficiently transport personnel and materials, and can compensate on different axes to absorb waves.


Important equipment for offshore wind power operation and maintenance - operation and maintenance ships
Abroad, offshore wind power has been widely developed in Europe, and wind power operation and maintenance ports and ships constitute the main facilities and equipment for offshore wind power operation and maintenance. They are at the forefront of wind power operation and maintenance. The "dual carbon" goal and the construction of a new power system in China
Long by picture save/share
0

推荐资讯

联系我们

热线电话:0571-82192326

边经理:15258176702

地址:浙江省杭州市萧山经济技术开发区鸿兴路389号4号楼(机器人小镇内)

正域科技
Phone
0571-82192326
Manager Bian
15258176702

Email:

jiabin.bian@gczhengyu.com

Company Address:

Building 4, No. 389 Hongxing Road, Xiaoshan Economic and Technological Development Zone, Hangzhou City, Zhejiang Province (within the Robot Town)

Services
Applications
Dynamic
About us

客服微信

关注微信公众号

Scan to follow

Customer service

official account

Copyright @ Hangzhou Guochen Zhengyu Technology Co., Ltdnbsp;浙ICP备18037861号-1  

Service Center
Hotline:
15258176702
Working hours:
Monday to Friday
E-mail:
jiabin.bian@gczhengyu.com
Qrcode
Scan to follow
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.